Targeting local equipment maintenance and pump operation & maintenance enterprises in Dalian, this document sorts out procedures for bearing sleeve disassembly and assembly, accessory selection, assembly commissioning and subsequent trial operation based on on-site maintenance conditions of various centrifugal pumps, sewage pumps and chemical pumps. It helps operators standardize bearing sleeve replacement work and reduce pump operation failures.
The first step of the Key Points for Replacing Bearing Sleeves of Dalian Pump Accessories is shutdown and on-site safety preparation. Before work, shut down the pump power supply, implement lockout-tagout, close inlet and outlet valves, drain the medium inside the pump chamber and release residual pipeline pressure. Clear debris around the pump, prepare disassembly tools, measuring instruments and new bearing sleeve parts, inspect the appearance of accessories and verify that the model and dimensions match the original parts. This is the pre-work specified in the key points.
Old part disassembly forms the basic section of the key points. Remove the end cover and sealing components in sequence according to the pump structure, then take out the rotor assembly. Use proper tooling to remove the old bearing sleeve to avoid damaging the pump shaft surface by hammering. During disassembly, inspect the old bearing sleeve for wear, corrosion and cracks, record wear locations, and check whether the mating section of the pump shaft has scratches, rust or other defects. If the shaft surface is damaged, repair it before installing the new bearing sleeve.
Accessory assembly is the core content of the key points. Clean the mating surface of the pump shaft and the inner bore of the new bearing sleeve before assembly to remove impurities and burrs. Control the fitting clearance in accordance with assembly requirements and select a suitable assembly method based on operating conditions. If hot mounting is adopted, control heating temperature and range to prevent high temperature from damaging the bearing sleeve material and pump shaft. After assembly in place, check the positioning of the bearing sleeve to ensure tight end face contact without offset or looseness, then fit sealing parts, end covers and other components in order.
Clearance adjustment and seal inspection are included in the key points. After assembly, verify the relevant fitting clearances of the bearing sleeve, rotate the rotor and check for smooth rotation without jamming or abnormal noise. Inspect the installation status of shaft seal assemblies and confirm no risk of eccentric wear on sealing positions. Install sealing parts properly to prevent damage during assembly and medium leakage in subsequent operation.
Trial operation and regular inspection are covered in the key points. After assembly, restore pipeline connections. Confirm all assembly parameters are correct and carry out no-load and loaded trial operation. Observe pump vibration and noise, monitor temperature changes and check for leakage at sealing positions. Stop the pump promptly for troubleshooting if abnormalities occur during trial run. After the equipment is put into service, conduct periodic inspection on temperature and vibration of the bearing sleeve area and keep operation records.
The Key Points for Replacing Bearing Sleeves of Dalian Pump Accessories stresses standardized maintenance procedures and strict control over accessory selection, disassembly and assembly. Maintenance personnel shall perform operations in accordance with the pump’s service medium and working conditions to reduce premature wear caused by improper assembly and ensure stable and continuous operation of pump units.